Week 9 - They installed our flooring, kitchen cabinets, and first coat of paint. All the hall and kitchen flooring was covered and protected by cardboard. Carpet was installed last in Week 10.
Week 10 - Our house is pretty much done. So during this week they installed the Carpet, Kitchen Appliances, and Faucets.
The Punch Out guy is there now putting on the final touches. He is the man who basically inspects the house before the inspection aka Pre Settlement meeting and makes sure everything is done and wraps up what was not done. Everything is pretty much in except for the shoe mold, 2nd coat of paint, White Column on Porch, Mirror in Hall Bathroom upstairs, and a few other minor things.
Living Room |
Powder Room |
Dining Room |
Powder Room |
First Floor Office |
Family Room |
Kitchen Dishwasher - Standard Black |
Kitchen - Standard Black Range |
Double Bowl Stainless Steel Standard Sink (I was disappointed this has no hole for a sprayer - so we will have to upgrade the faucet instead) |
Master Bedroom and Sitting Area |
1st Master Bedroom Closet |
1st Master Bedroom Closet - Other Side |
Master Bathroom with Double Bowl Sinks |
Master Bathroom Shower |
Master Bathroom Toilet |
Master Bathroom Garden Tub |
2nd Master Bedroom Closet off the Bathroom - This one is all Mine! LOL! |
2nd Master Bedroom Closet - Other Side |
Hall Bathroom |
Hall Bathroom DIY Project: Small Cbinet will be replace with a Larger Cabinet/Counter Top ASAP. |
Hall Closet I was so happy it didn't have that pole down the middle :) |
Laundry Room |
Upstairs Hallway |
Bedroom 3 - I think LOL |
Bedroom 3 Closet - I think |
4th Bedroom - This will be my 2nd Office |
4th Bedroom - Closet |
Hall with View of Loft with 2 Foot Extension from Elevation C |
Kitchen |
Pantry |
Our Backyard |
Our Backyard |